Restoration and Expansion 619 Wealthy SE

CSI Bridge and Stocking Development Tour

Event Date: 
Thursday, April 12, 2018 - 5:45pm to 7:00pm
Event Location: 
Rockford Construction, 601 Front NW, Grand Rapids, MI

CSI Bridge and Stocking Development Tour

More Information

RSVP direct to Pat Corderman at Rockford Construction pcorderman@rockfordconstruction.com

Meet at 5:45 p.m. at Rockford Construction, 601 Front NW, Grand Rapids, MI.  Be sure to bring your PPE (see below).  We will walk to the site.

After the tours, we'll convene at the Knickerbocker for complimentary appetizers and drinks!

Project Details:

Project “Bridge and Stocking” bordered by Bridge, Stocking, First, and Seward streets, on Grand Rapids’ West Side, will include several components, bringing a diverse mix of residential units, job training opportunities, offce users, and key neighborhood services. 

These services include Meijer as a neighborhood grocery concept that will utilize 38,000 SF with a sidewalk produce market; and street level retail which will reside below the Inner City Christian Federation (ICCF) Development and include 11,250 SF. Rockford is also offering 116 market-rate apartments above Meijer totaling 85,000 SF, and affordable apartments developed by ICCF will be available at 71,500 SF with 64 units.

60,000 SF of the project will also be dedicated to workspace with West Michigan Center for Arts and Technology (WMCAT) using 21,000 SF for its corporate offce. A 275-space parking structure also sits at the center of this project, providing three stories of parking.

ROCKFORD CONSTRUCTION SITE VISITOR SAFETY POLICIES AND PROCEDURES:

Rockford Construction embraces the health and safety of all persons on our job sites as our highest core value.  In concurrence, we respectfully require all job site guests and visitors abide by this safety policy.

Guest/Visits: 

Any person entering a Rockford Construction job site for the purpose of observing, meeting, or performing non-work activities much check in and out with the Rockford superintendent

Required Attire:

  • Hard-soled shoes or boots (no athletic shoes, flats, sandals, heels, or open-toed shoes)
  • Long pants (no skirts, shorts, or athletic pants)
  • Shirts with sleeves (t-shirt at a minimum, no sleeveless or tank tops)
  • Personal protective equipment including hard hat, safety glasses, and high-visibility vest will be provided by Rockford Construction staff at the time of job site arrival, prior to entering any areas of work.